New federal filings, as they're docketed

Chapter 11 petitions and federal civil suits naming commercial real estate businesses, read straight from the docket. See this month's numbers by state and court →

Chapter 11 Watch
See all 199 Chapter 11 petitions →
Case Value Calculator · Beta

What might your case be worth?

Describe your own lease, lending, construction, REIT, eminent domain, environmental, zoning, or premises liability dispute and get a probability-informed damages range, grounded in real cited settlements and judgments.

Try the Case Value Calculator
364 matters
Eminent Domain Verified Update Ruling Issued

Matter of Target Corp. v. County of Monroe Industrial Development Agency: Fourth Department Confirms Condemnation of Target's Contractual Rights Tied to Former Medley Centre Mall

The Fourth Department confirmed COMIDA's condemnation of Target's contractual rights tied to the former Medley Centre in Irondequoit, N.Y., holding that Target did not appear at the public hearing and could not raise its substantive objections.

On November 20, 2026, the Appellate Division, Fourth Department, unanimously confirmed a determination by the County of Monroe Industrial Development Agency (COMIDA) to condemn certain contractual rights held by Target Corporation, and dismissed Target's petition. The court held that COMIDA's hearing notice and accompanying letter satisfied EDPL section 202, and that Target's substantive objections were not properly before it because no one appeared for Target at the public hearing.

Condemnation of contractual rights (no dollar figure stated)
Nov 20, 2026 New York Supreme Court, Appellate Division, Fourth Department
Commercial Lease Disputes Verified Update Ruling Issued

Siegel LV North Strip Tolleson LLC v. EC 215 Las Vegas LLC: Nevada Supreme Court Affirms Order Requiring Removal of Fence and Gate System From Las Vegas Strip Parking Lot

Nevada's Supreme Court affirmed a preliminary injunction requiring Siegel entities to remove a fence and QR-code gate system from a Las Vegas Strip parking lot, which the trial court found likely violates a Parking Easement Agreement with a strip-mall owner.

In an order of affirmance, the Nevada Supreme Court upheld a preliminary injunction requiring Siegel LV North Strip Tolleson LLC to remove a fence and gate system from a parking lot it bought on the Las Vegas Strip. The lot is subject to a Parking Easement Agreement granting access to the neighboring strip mall owner, EC 215 Las Vegas LLC, and its patrons.

Injunctive relief
Nov 20, 2026 Nevada Supreme Court
Commercial Lease Disputes Verified Update Ruling Issued

73 Dun One, Inc. v. Gould Holdings, LLC: New Jersey Appellate Division Holds Purchase of the Whole Property Did Not Trigger Tenant's Lease Right of First Refusal on Its Premises

The New Jersey Appellate Division affirmed summary judgment against a Berlin Township tenant that claimed its lease's right of first refusal was triggered when Gould Holdings, LLC bought the whole property; tax arrears were remanded for findings.

On November 19, 2026, the New Jersey Appellate Division affirmed summary judgment dismissing tenant 73 Dun One, Inc.'s claims that its lease right of first refusal was breached when Gould Holdings, LLC purchased the commercial property containing its premises. The court read the provision as applying only to the leased premises, not the property as a whole, and found no bona fide offer had been made for the premises alone. It remanded for findings on the real estate taxes and interest the tenant owes for 2023 to 2025.

Right of first refusal; real estate tax arrears
Nov 19, 2026 Superior Court of New Jersey, Appellate Division
Lending & Foreclosure Verified Update Pending

101 Hudson Street, Jersey City: $250M CMBS Loan Sent to Special Servicing After Missed October 2026 Maturity

A $250 million CMBS loan on 101 Hudson Street, a 42-story Jersey City office tower, went to special servicing after missing its October 2026 maturity, Commercial Observer reported, citing a Morningstar Credit alert.

Commercial Observer reported on Nov. 19, 2026 that a $250 million commercial mortgage-backed securities loan on 101 Hudson Street, a 42-story, 1.4 million-square-foot office building in Jersey City, was sent to special servicing after missing its October 2026 maturity date. The report cites an alert from Morningstar Credit and does not give the date of the transfer.

$250 million CMBS loan
Nov 19, 2026 Jersey City, New Jersey (no court case reported; loan in special servicing)
Lending & Foreclosure Verified Update Pending

123 William Street: $140M CMBS Loan on American Strategic Investment Company's Financial District Office Building Enters Special Servicing

A $140 million CMBS loan on 123 William Street, a 27-story Financial District office building owned by American Strategic Investment Company, entered special servicing after an occupancy drop, Commercial Observer reported.

A $140 million commercial mortgage-backed securities loan backing 123 William Street, a 27-story, 540,000-square-foot office building in Manhattan's Financial District, entered special servicing after it fell below break-even levels following a steep drop in occupancy, Commercial Observer reported, citing a Morningstar Credit alert issued the morning of Thursday, Nov. 19, 2026. The report does not give the date of the transfer. The loan is slated to mature in March 2027.

$140 million CMBS loan
Nov 19, 2026 New York, New York (no court case reported; loan in special servicing)
Lending & Foreclosure Verified Update Ruling Issued

In re New Grant Acquisitions, LLC: Chapter 11 Plan Confirmed in Atlanta Grant Building Case; Creditor UC Grant Building Holder, LLC Appeals and Seeks Emergency Stay

The bankruptcy court confirmed New Grant Acquisitions, LLC's Fifth Amended Plan on Nov. 19. Creditor UC Grant Building Holder, LLC appealed within the hour and moved for an emergency stay. Atlanta's Grant Building was marketed in the case.

Bankruptcy Observer's docket brief reports that on Nov. 19 the bankruptcy court entered an order approving the disclosure statement and confirming the Fifth Amended Plan of Reorganization of New Grant Acquisitions, LLC. Creditor UC Grant Building Holder, LLC filed a notice of appeal to the district court within the hour, followed by an emergency motion for a stay pending appeal and a motion to expedite a ruling on it. A January 2026 Hilco Global release said the sale of the Grant Building in downtown Atlanta was being conducted subject to the court's approval in the same case.

Chapter 11 plan confirmation
Nov 19, 2026 U.S. Bankruptcy Court, Northern District of Georgia
Environmental Verified Update Filed

Center for Biological Diversity Sues New Mexico Office of the State Engineer Over Emergency Water Authorization for Project Jupiter Data Center Construction

The Center for Biological Diversity sued New Mexico's Office of the State Engineer over an October 2025 emergency authorization letting groundwater be used to build the 1,400-acre Project Jupiter data center; it seeks a pause in water use.

The Center for Biological Diversity sued the New Mexico Office of the State Engineer on Nov. 19, 2026 in the 1st Judicial District Court, the Albuquerque Journal reported. The suit challenges an emergency authorization the state engineer granted in October 2025 to Santa Teresa Capital LLC, the company that owns the water rights, and demands a pause in water use at the Project Jupiter construction site in Doña Ana County.

Pause in construction water use sought
Nov 19, 2026 New Mexico First Judicial District Court, Santa Fe County
Eminent Domain Verified Update Ruling Issued

Boulevard Mall, Amherst, N.Y.: State Supreme Court Judge Approves Town of Amherst's Eminent Domain Bid for Mall Site Properties

A state supreme court judge approved the Town of Amherst's bid to acquire properties on the Boulevard Mall site through eminent domain, WIVB reported. The town supervisor said demolition is now very close.

A state supreme court judge on Thursday, Nov. 19, 2026 approved the Town of Amherst's bid to acquire properties on the Boulevard Mall site through eminent domain, WIVB reported. The town supervisor said more details on the judgment will be available at a town board meeting on Nov. 30.

Not stated
Nov 19, 2026 New York Supreme Court
Environmental Verified Update Ruling Issued

Vineland Data Center Noise Class Action: New Jersey Superior Court Judge Denies Motion to Dismiss Suit Against DataOne

Judge James Swift denied a motion to dismiss a class action alleging DataOne failed to soundproof the engines and cooling systems of the 300-megawatt Vineland data center it is developing, WHYY reported. The defense must now file an answer.

A New Jersey Superior Court judge this week denied a motion to dismiss a class action over noise from a 300-megawatt data center in Vineland, N.J., WHYY reported in an article updated Nov. 19, 2026; the report does not give the day of the ruling. The lawsuit alleges DataOne has failed to soundproof the data center's engines and cooling systems. The defense must now file an answer, and both sides will begin exchanging evidence.

Damages not stated
Nov 19, 2026 New Jersey Superior Court, Cumberland County
Lending & Foreclosure Verified Update Pending

191 Peachtree Tower, Atlanta: $175.5M Loan Moves to Special Servicing After Borrower Says It Can't Pay at Maturity

Bisnow reports that Rialto Capital took over the $175.5M loan on Atlanta's 191 Peachtree Tower in October 2026 after the borrower said it could not pay off the balance at maturity.

Bisnow reported on Nov. 19, 2026 that the loan on 191 Peachtree Tower in Atlanta has entered special servicing after the borrower said it could not pay off the balance at maturity. According to Bisnow, citing Morningstar Analytics, Rialto Capital took over the $175.5M loan the month before, in October 2026, due to "imminent monetary default." Banyan, the tower's owner, did not respond to Bisnow's request for comment.

$175.5M loan
Nov 19, 2026 CMBS special servicing (no court filing reported)
Zoning & Land Use Verified Update Ruling Issued

Emerald Valley, LLC v. Benton County Planning Board: Arkansas Court of Appeals Affirms Dismissal of Neighbors' Challenge to 209-Acre Glamping Site Plan Near Beaver Lake

The Arkansas Court of Appeals affirmed dismissal of neighbors' appeal of a Benton County Planning Board site plan approval for Contentment on Beaver Lake, LLC's glamping site on 209 acres, because no administrative record was ever filed.

On November 18, 2026, the Arkansas Court of Appeals affirmed a circuit court's dismissal with prejudice of an appeal by Emerald Valley, LLC and other neighbors from the Benton County Planning Board's 20 March 2024 approval of a site plan for Contentment on Beaver Lake, LLC. The plan is for a "glamping site" on 209 acres near Beaver Lake. The court held the neighbors never filed any materials from the administrative proceeding, as District Court Rule 9(f) requires within thirty days after the notice of appeal.

Site plan approval (no amount stated)
Nov 18, 2026 Arkansas Court of Appeals, Division IV
Zoning & Land Use Verified Update Ruling Issued

Louisiana Second Circuit Affirms Shreveport City Council's Special Use Permit for Data Center at Resilient Technology Park

Louisiana's Second Circuit affirmed the Shreveport City Council's special use permit for a data center of seven 400,000-square-foot buildings on about 254 acres at Resilient Technology Park, rejecting a challenge by three individual plaintiffs.

On November 18, 2026, the Louisiana Court of Appeal, Second Circuit, affirmed a Caddo Parish trial court judgment that upheld the Shreveport City Council's approval of a special use permit for a proposed data center at Resilient Technology Park. The council had unanimously reversed the planning commission, whose tied vote was treated as a denial. The appeals court found nothing in the record showing the council acted arbitrarily or capriciously.

Special use permit (no dollar amount at issue)
Nov 18, 2026 Louisiana Court of Appeal, Second Circuit
Lending & Foreclosure Verified Update Ruling Issued

In re DK Arena, Inc: Amended Chapter 11 Plan Confirmed; K&K Developers Bid $56.05 Million at Auction for 53-Acre Former Palm Beach Jai-Alai Site in Mangonia Park

An order entered Nov. 18 confirmed DK Arena, Inc's amended Chapter 11 plan. The Miami Herald reported that K&K Developers bid $56.05 million at a bankruptcy auction for the 53-acre former Palm Beach Jai-Alai site in Mangonia Park.

Bankruptcy Observer reported that an order approving the amended disclosure statement and confirming the debtor's amended Chapter 11 plan was entered Nov. 18 in the case of DK Arena, Inc, No. 26-16307 in the Southern District of Florida. The Miami Herald reported the same day that K&K Developers, an affiliate of Garden Communities, won a bankruptcy auction for the 53-acre former Palm Beach Jai-Alai property in Mangonia Park with a $56.05 million bid, topping a $55 million offer from Palm 50 Acres LLC.

$56.05 million winning auction bid
Nov 18, 2026 U.S. Bankruptcy Court, Southern District of Florida
Commercial Lease Disputes Verified Update Ruling Issued

Northern Biomedical Research, Inc. v. NBR Investment Properties, LLC: Michigan Court of Appeals Affirms Specific Performance of Tenant's Lease Purchase Option After Landlord Refused to Close Over Appraisal

The Michigan Court of Appeals affirmed rulings that landlord NBR Investment Properties, LLC must complete the sale of a leased property to its tenant under a lease purchase option, after an appraisal set a net value of $8.87 million.

On November 18, 2026, the Michigan Court of Appeals affirmed Muskegon Circuit Court rulings that granted summary disposition and specific performance to tenant Northern Biomedical Research, Inc. on its option to buy the property it leased from NBR Investment Properties, LLC. The landlord had refused to close after the appraisal called for by the lease produced a net appraised value of $8.87 million. The court also rejected the tenant's cross-appeal on damages and on a setoff for the landlord's costs of ownership.

$8.87 million net appraised value
Nov 18, 2026 Michigan Court of Appeals
Eminent Domain Verified Update Ruling Issued

In re Condemnation by the Pennsylvania Turnpike Commission (Appeal of IBIS Kennywood, LLC): Commonwealth Court Upholds Notice of Partial Taking at West Mifflin Shopping Center

The Commonwealth Court affirmed an order overruling IBIS Kennywood, LLC's objections to the Pennsylvania Turnpike Commission's partial taking of its West Mifflin shopping center property for the Mon-Fayette Expressway.

On November 17, 2026, the Commonwealth Court of Pennsylvania affirmed an Allegheny County order overruling IBIS Kennywood, LLC's preliminary objections to the Pennsylvania Turnpike Commission's condemnation notice. The owner argued the plot plans served with the declaration of taking did not properly show the portions of its shopping center property being taken. The court held that the Commission complied with the Eminent Domain Code's plot-plan notice requirement for a partial taking.

Partial taking; damages referred to a Board of Viewers
Nov 17, 2026 Commonwealth Court of Pennsylvania
Zoning & Land Use Verified Update Pending

ADP Little Rock Data Hub LLC v. Pulaski County: Federal Judge Denies County Judge-Elect's Bid to Intervene in Data Center Ordinance Suit

A federal judge denied the Pulaski County judge-elect's bid to intervene in ADP Little Rock Data Hub LLC's suit over a county data center ordinance. The company is seeking to build a $6 billion data center near Wrightsville.

KATV reported that U.S. District Judge Lee P. Rudofsky on Tuesday, Nov. 17, 2026 denied the incoming Pulaski County judge's request to join a lawsuit that ADP Little Rock Data Hub LLC filed against Pulaski County and two county officials. The company is challenging a county ordinance regulating data centers and has asked the court to temporarily block its enforcement. The order lets the judge-elect file an amicus brief on the preliminary injunction question by Nov. 19 and does not resolve the lawsuit or the injunction request.

Injunctive relief; $6 billion data center project
Nov 17, 2026 U.S. District Court, Eastern District of Arkansas
Construction Defect Verified Update Ruling Issued

Cadence McShane Construction Company LLC v. San Antonio Housing Facility Corporation: Texas Business Court Keeps Suit Over $45 Million Horizon Pointe Apartment Project (2026 Tex. Bus. 83)

The Texas Business Court kept a construction manager's suit over profits on the $45 million Horizon Pointe affordable-housing apartment project in San Antonio, rejecting the owner's argument that less than $5 million is in controversy.

On November 17, 2026, the Business Court of Texas, Fourth Division, denied San Antonio Housing Facility Corporation's motion to dismiss a declaratory-judgment suit by Cadence McShane Construction Company LLC over the Horizon Pointe affordable-housing apartment project in San Antonio. The housing corporation argued the suit did not meet the court's $5 million jurisdictional minimum, pointing to its own separate Bexar County suit, in which it seeks $4,999,999.99 in contractual damages. The court held that Cadence's petition controlled because the housing corporation offered no evidence on the total value of the rights at issue.

More than $5 million pleaded in controversy on a $45 million project
Nov 17, 2026 Business Court of Texas, Fourth Division
Zoning & Land Use Verified Update Ruling Issued

City of Jarrell, Texas v. BE Theon East Partnership No. 3, Ltd.: Austin Appeals Court Affirms Order That City Perform 2008 Development Agreement's Water and Wastewater Promise

The Austin court of appeals affirmed a judgment ordering the City of Jarrell to invite and award bids for water and wastewater utilities to a 24.4-acre tract it annexed under a 2008 development agreement with BE Theon East Partnership No. 3, Ltd.

In a memorandum opinion filed November 17, 2026, the Texas Court of Appeals in Austin affirmed a summary judgment for BE Theon East Partnership No. 3, Ltd. that orders the City of Jarrell to specifically perform a 2008 development agreement. Under the agreement, the landowner let the city annex its undeveloped 24.4-acre property in Williamson County and the city agreed to provide water and wastewater capacity. The court rejected the city's argument that the agreement was too indefinite to enforce and held that two other arguments were not preserved.

Specific performance
Nov 17, 2026 Texas Court of Appeals, Third District, at Austin
Lending & Foreclosure Verified Update Ruling Issued

In re Kahn Property Owner, LLC (Oheka Castle): Chapter 11 Plan Confirmed After $72 Million Auction Bid by Gold Coast Property & Estate Management LLC

Minute entries in the Chapter 11 case of Oheka Castle's owner record a confirmed plan and more time for auction winner Gold Coast Property & Estate Management LLC to pay the buyer's premium on its $72 million bid.

Court minute entries listed under Nov. 17, 2026 on the docket of the Chapter 11 case of Kahn Property Owner, LLC, the company that owns Oheka Castle, record "Plan Confirmed. Submit Order." The entries also record approval of a request to extend the time to pay the buyer's premium and the withdrawal of the U.S. Trustee's motion to convert or dismiss the case. Gold Coast Property & Estate Management LLC bid $72 million for the estate at an Oct. 27 auction.

$72 million auction bid; about $61 million of debt
Nov 17, 2026 U.S. Bankruptcy Court, Eastern District of New York
Eminent Domain Verified Update Pending

Town of Speedway Drops Eminent Domain Lawsuit Against Wilshaw Hotel LLC Over Stalled Hotel Site at 16th and Main Streets, Says It May Refile

The Town of Speedway voluntarily dismissed the eminent domain suit it filed Oct. 28 against Wilshaw Hotel LLC over the stalled 127-room hotel site at 16th and Main streets, saying it may restart the case after completing statutory steps.

The Town of Speedway, Indiana has voluntarily dismissed the eminent domain lawsuit it filed Oct. 28 to take the site of the stalled Wilshaw hotel project. The Indiana Lawyer, relaying IBJ reporting, said the town's notice described the dismissal as made in an abundance of caution to ensure compliance with the statutory acquisition process. The town said it intends to restart condemnation proceedings if necessary once the statutory prerequisites are complete.

Condemnation of a roughly 1-acre hotel site
Nov 17, 2026 Marion County, Indiana
Zoning & Land Use Verified Update Ruling Issued

Water's Edge at Wind Gap, LLC v. Zoning Hearing Board of Moore Township: Pennsylvania Commonwealth Court Affirms Denial of Woodland Variance for Two-Warehouse Plan

Pennsylvania's Commonwealth Court affirmed the Moore Township Zoning Hearing Board's denial of a variance that would have let a developer preserve 55% of a 51-acre golf course's woodlands, not the required 60%, for two warehouses.

On November 16, 2026, the Commonwealth Court of Pennsylvania affirmed the denial of a dimensional variance sought by Water's Edge at Wind Gap, LLC, which seeks to redevelop its 51-acre golf course property in Moore Township into an industrial development with two warehouses. The developer asked to preserve 55% of the property's woodlands, a 5% reduction from the 60% the zoning ordinance requires. The court held that substantial evidence supported the Zoning Hearing Board's finding that the variance would adversely affect the character of the neighborhood.

Zoning variance for a two-warehouse development on 51 acres
Nov 16, 2026 Commonwealth Court of Pennsylvania
Commercial Lease Disputes Verified Update Ruling Issued

SH Nashville, LLC v. FWREF Nashville Airport, LLC: Tennessee Supreme Court Enforces $18,917,500 Earnest-Money Forfeiture on Sale of Hilton-Branded Hotel Near Nashville Airport

The Tennessee Supreme Court upheld summary judgment for the seller of a Hilton-branded hotel near the Nashville airport, letting it keep $18,917,500 in earnest money as liquidated damages after the buyer failed to close.

On November 16, 2026, the Tennessee Supreme Court reversed the Court of Appeals and upheld summary judgment for FWREF Nashville Airport, LLC, the seller of a Hilton-branded hotel near the Nashville airport, in a dispute over $18,917,500 in earnest money. The court held that when parties agree that actual damages are difficult to ascertain and that a liquidated sum is a reasonable estimate, the provision is presumed enforceable, and the party resisting it must show by a preponderance of the evidence that it is a penalty. It found the purchaser had not raised a question of fact to overcome the presumption.

$18,917,500 in earnest money retained as liquidated damages
Nov 16, 2026 Tennessee Supreme Court
Zoning & Land Use Verified Update Ruling Issued

Dickard v. Jackson & Jackson, L.L.C.: Ohio Appeals Court Revives Property Owner's Zoning Challenge and Section 1983 Takings Claim (2026-Ohio-4530)

An Ohio appeals court revived a commercial electrical company's as-applied zoning challenge and federal takings claim against Butler County over an order to stop business use of a nine-acre, residentially zoned site it bought for $270,000.

On November 16, 2026, Ohio's Twelfth District Court of Appeals partly reversed the dismissal of counterclaims that Jackson & Jackson, LLC brought after the Butler County Zoning Inspector sued to stop its business use of a residentially zoned property. The court held that a Section 1983 claim for compensation for a regulatory taking is subject to the four-year limitations period in R.C. 2305.09(E), that such a claim need not be preceded by a mandamus action, and that the company did not have to appeal its variance denial before bringing a declaratory judgment challenge to the zoning. One declaratory count stays dismissed.

Injunctive relief; takings compensation sought
Nov 16, 2026 Ohio Court of Appeals, Twelfth Appellate District (Butler County)
Zoning & Land Use Verified Update Ruling Issued

BTE Properties, L.L.C. v. Township of Parkman: Divided Ohio Appeals Court Enforces 1843 Public-Square Deed Restriction on Parcel Within Commercial Lot (2026-Ohio-4538)

A divided Ohio appeals court held that an 1843 public-square restriction, repeated in a 2018 township deed, binds a parcel inside BTE Properties' 2.6298-acre commercial lot. ABC Development had agreed to buy land containing the parcel.

On November 16, 2026, Ohio's Eleventh District Court of Appeals affirmed summary judgment for the Township of Parkman and the dismissal of BTE Properties, L.L.C.'s quiet title complaint. The court held that the 2018 deed conveying a small parcel from the township to BTE carried a valid use restriction requiring the land to be kept as a public square or commons with no structures. BTE had folded the parcel into a 2.6298-acre commercial lot and agreed to sell land containing it to ABC Development L.L.C. One judge dissented.

Quiet title; declaratory relief
Nov 16, 2026 Ohio Court of Appeals, Eleventh Appellate District (Geauga County)

Showing the 24 most recent of 364 matters. Filters and the full list load with JavaScript.